
Verifying engine assembly and recording the hands that do it
Cameras check each assembly step at the station, and the best assembler's work becomes the training clips for new ones.
- In development
- Assembly
- Computer VisionEdge AI
- Edge: Jetson Orin per station, 1 fixed camera + 1 head-mounted camera.
- Torque tools, station andon, engine serial record
It lives in the head of the senior assembler.
He knows the order that avoids a pinched gasket and the feel of a correctly seated bearing. New assemblers take months to pick it up by watching him.
- Assemblers must keep both hands free.
- Capture must not slow the line.
- Consent and privacy for head-mounted recording.
- 01
Define the steps
The station's sequence is written with the senior assembler, step by step.
- 02
Verify each step
A fixed camera checks parts present and order. A missed step lights the andon.
- 03
Capture the demonstration
A head-mounted camera records the expert's hands, synced to the fixed view and torque events.
- 04
Label from the process
Step boundaries come from the verification model, so every clip is labelled as it is recorded.
- Missed steps caught at the station.
- A per-engine record of what was done, in what order.
- Training clips for new assemblers from the best one.
A step-by-step record of how your best assembler builds an engine.
- D1Egocentric video of the expert's hands
- D2Fixed-camera view of the same action
- D3Step labels and boundaries from the verification model
- D4Torque-tool events and engine serial
Recorded on site and owned by the plant. The system uses it to keep learning your floor.
- 01
Capture
Fixed station camera, head-mounted camera, torque tool feed
- 02
Edge
Jetson Orin: step recognition, sync, local store
- 03
Model
Step and part-presence detection per station
- 04
Record
Per-engine step log and step-labelled training clips
- 05
Surface
Station andon, supervisor view, training clip library
Fewer assembly faults at the test bench.
PILOT MEASUREMENT REQUIRED: bench failures traced to assembly, before and after.
Verification keeps up with the line.
PILOT MEASUREMENT REQUIRED: added seconds per station.
A training library for new assemblers builds up.
PILOT MEASUREMENT REQUIRED: hours of step-labelled clips.
Run a plant with an expert like this?
Tell us whose judgement your floor cannot run without. That is where a pilot starts.